January
- Construction announced for The Gardens, Nedlands, with the appointment of Thomas Building.
- Construction announced for The Dunes, Scarborough, with the appointment of Roberts Co.
February
- Construction commences at Broadway on the Bay, Crawley with Edge Construction.
- Rivière Residences East Building tops out!
- The Gardens breaks ground with a sod-turning celebration. Piling works are complete.
March
- Construction commences at Clayton’s Mindarie with Edge Construction.
April
- Rivière Residences central tower tops out!
- Construction commences on Lumiere in South Perth
May
- Crane mobilised at Broadway on the Bay, Crawley.
- Hillam Architects awarded a project with the City of Perth for Pier Street Carpark.
June
- The crane is installed at The Gardens and the first slab pour is complete.
July
- Crane is mobilised at Clayton’s Mindarie.
- Design work commences for a private single residence in Margaret River.
August
- The first curved column is poured at The Gardens. A key element of the façade is the beautiful soft curve, which are a contemporary reference to the classic Art Deco design throughout Nedlands.
- Scaffolding begins to drop at Rivière Residences.
- Hillam Architects win a modular housing project for regional key worker accommodation.
September
- Hillam Architects win a regional project for site masterplanning and key worker accommodation.
- Hay Street Terraces DA approved.
October
- Rivière Residences achieves a great design and engineering milestone with the removal of the props for the feature cantilevered pool.
- A striking feature column has been completed at The Gardens, adding a unique architectural element to the project at the entrance to the foyer.
- Bulk earthworks are well underway at The Dunes with 700m3 of earthworks being moved from site each day.
November
- Delos Way, Sorrento, goes out to public comment.